We have reached several milestones on in construction since the last time I posted on the subject.  We have all but finished the painting.  I'm just waiting for a dry day to go do the trim outside.  Juan has started making the window frames.

Marvin and Jose have learned to cut ceramic tile and lay them.



 
Jose learned how to cut the tile to fit around the columns



The finished job on the balcony floor

The real owner of the house inspects the finished job on the balcony floor

The welder has designed the railings for the balcony and for the security bars over the windows.These railings don't come prefab. The welder has to puut together all the pieces so they fit the space exactly nd everything is on center.


We were very pleased with the design the welder produced.  The only change is that we want the paint changed from glossy to matte


This is a close up of the medalions.  This is a security bar, so the medalions are on every otherd upright.  On the balcony railings they are on every third upright.


This is approximately how the security bars on the windows will look

Today MM started laying the tile in the great room. 




We laid out almost the whole living room floor last night; played with  tile, and moved tile.  This pattern is too busy.  This pattern doesn't show off the decorative tiles.  At 7 PM we said, Eureka, this is it!!!!

We are blessed